ITA  ENG

Last works

  • Tempa Rossa

    Preparatory work for the oil field called “Tempa Rossa”.

    Region

    Basilicata

    Client

    TOTAL E&P Italia

    Project status

    Ongoing

    Project amount

    € 40.000.000
  • 655 Bradanica road: lot “La Martella”

    The works consist in building the last lot of the S.S. (state road) 655 “Bradanica” linking Matera with Foggia.

    Region

    Basilicata

    Client

    Anas

    Project status

    Ongoing

    Project amount

    € 39.000.000
  • 96 Barese road: Toritto-Modugno

    Works are to modernise, with adjustment to section III C.N.R., including the Palo del Colle variant for an extension of around 9.0 km; with a 19 metre paved platform.

    Region

    Puglia

    Client

    Anas

    Project status

    Ongoing

    Project amount

    € 72.000.000
  • Brindisi Airport

    Air-Side area expansion works at Brindisi airport

    Region

    Puglia

    Client

    SEAP Aeroporti di Puglia

    Project status

    Completed

    Project amount

    € 12.500.000
  • 597 road: Sassari-Olbia lot 1

    Realization of Sassari-Olbia section 1.

    Region

    Sardegna

    Client

    Anas

    Project status

    Completed

    Project amount

    € 57.000.000
  • 16 Adriatica road: Molfetta/Giovinazzo

    Connecting roads between trunk road 16 “Adriatica” and the coastal road south of Giovinazzo in proximity to the junction with the provincial road from Giovinazzo to Bitonto.

    Region

    Puglia

    Client

    Anas

    Project status

    Ongoing

    Project amount

    € 11.000.000